Overhead cranes—often called bridge cranes—are the quiet workhorses that keep heavy industry moving. This field-tested breakdown takes you behind the scenes of a mega-project crane install. You’ll see structural checks, safety, and QA/QC—all explained in clear, real-world language.
What an Overhead/Bridge Crane Is
At heart, a bridge crane is a bridge beam that spans between two runway beams, carrying a trolley-mounted hoist for precise, vertical picks. The result is smooth X-Y-Z motion: and lift via the hoist.
You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Huge efficiency gains.
Repeatable, precise positioning that reduces damage.
Support for pipelines, structural steel, and big machinery installs.
System Components We’re Installing
Runways & rails: continuous beams and rail caps.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: cross-travel carriage with lifting unit.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: overload protection, e-stops.
Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.
Make-Ready & Surveys
A clean install is mostly planning. Key steps:
Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.
Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.
Runway verification: Survey columns and runway beams for straightness, elevation, and span.
Power readiness: Lockout/tagout plan for energization.
Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.
People & roles: Appoint a lift director, rigger, signaler, and electrical lead.
Tiny survey errors balloon into hours of rework. Spend time here.
Alignment That Saves Your Wheels
If rails are off, nothing else will run true. Targets and checks:
Straightness & elevation: shim packs under clips to meet tolerance.
Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.
End stops & buffers: Install and torque per spec.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Record as-built readings. Correct now or pay later in wheel wear and motor overloads.
Putting the Span in the Air
Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.
Sequence:
Lift end trucks to runway level and set temporarily on blocks.
Rig the bridge girder(s) and make the main lift.
Land the bridge on the end trucks and pin/bolt per GA.
Verify camber and bridge square.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.
The Heart of the Lift
Trolley installation: Mount wheels, align wheel flanges, set side-clearances.
Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.
Limits & load devices: Check overload/SLI and emergency stop.
Cross-travel adjustment: Verify end stops and bumpers.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
Grinding noises mean something’s off—stop and inspect. Fix the mechanics first.
Electrics & Controls
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.
Cable management: Secure junction boxes; label everything for maintenance.
Future you will too. Photos of terminations help later troubleshooting.
QA/QC & Documentation
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Record wrench serials and values.
Level & gauge reports: Note any corrective shims.
Motor rotation & phasing: Document bump tests.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Proving the System
Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Operator basics, daily pre-use checks, rigging construction design do’s & don’ts.
When the logbook is clean, the crane is officially in service.
Everyday Heavy Lifting
Construction & steel erection: handling long members safely.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: large part transfer.
Warehousing & logistics: high throughput lanes.
Once teams learn the motions, cycle times drop and safety improves.
Do It Safe or Don’t Do It
Rigging discipline: dedicated signaler and stop-work authority.
Lockout/Tagout: test before touch every time.
Fall protection & edges: scissor lifts and manlifts inspected.
Runway integrity: no cracked welds, correct bolt grades, proper grout.
Duty class selection: match crane class to cycles and loads.
A perfect lift is the one nobody notices because nothing went wrong.
If It Doesn’t Run Smooth
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: dress rope and reset lower limit.
Pendant lag or dropout: shield noisy VFD cables.
Wheel wear & rail pitting: add rail sweeps and check clip torque.
A 10-minute weekly check saves days of downtime later.
FAQ Snippets
Overhead vs. gantry? Choose per site constraints.
Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.
How long does install take? Anything from a couple weeks to a few months.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
Why Watch/Read This
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.
Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?
Grab the installer pack and cut hours from setup while boosting safety and QA/QC. Save it to your site tablet for quick reference.
...
Read more arabic articles...
read more about this products